Skip to main content

Client: Carillion M40 Project
Location: 3 x sites along M40 motorway – High Wycombe, Thame and Banbury
Date: Ongoing
Sector: General Motorway

GPT-Carillion-Case-StudyAbout the Project:

Carillion operate the management of the entire M40 motorway system in respect of traffic management, waste management, litter pick and other specialist services to ensure that the motorway operates safely and efficiently.

Based at 3 depots along the length of the motorway, operatives clear the carriageways of all general waste, as well as waste generated from RTAs, shredded tyres and other traffic related waste.

This is then transported back to the various yards for collection and disposal.

Project Challenges:

Site visits were undertaken and proposals made for an improved service, including a reduction in the number of containers on sites, as well as the way the waste is managed.

To find out more about this ongoing project, download our case study here.

Services and Products:
40yrd Roll on Off Containers for GMW  tick
40yrd Roll on Off Containers for Metal Waste  tick
20yrds Roll on Containers for Inerts  tick
8yrd Skip for tyres  tick
205Ltr Drums for various Hazardous Waste and Contaminated  tick