Client: Sodexo FM- Pilkington plc
Location: Greengate Works, St Helens
Date: Ongoing
Sector: Manufacturing
About the Project:
GPT were contacted by the client following the set-up of a new manufacturing process on site. This resulted in the production of a new waste stream, the exact composition of which was unknown.
The requirement was to remove large quantities of up to 13 tonnes of the waste stream, in powder format, from site. A site visit was undertaken immediately, in order to assess the logistics of the job and also to understand both the process from which the waste was produced and the make- up of the waste.
A sample was taken within 24 hours of the request and sent for analysis by GPT.
RoRo containers were discussed but after consideration were deemed to be unsuitable due to the loose nature of the powder and potential problems which could arise during the disbursement of waste around site.
With this in mind, it was decided that tanker collections would provide the optimum method of collection and prove most cost effective whilst maximising load weights being removed from site.
For more information, download the case study here.
To speak to someone about your waste management requirements, call 0844 854 5000 or email info@gptwaste.com
We also offer a full Waste Review Service free of charge. Find out how you can help your business deal more effectively with your waste: Call 0844 854 5000 or email here.
Subscribe to The Waste Solution blog by Email or subscribe to the RSS feed to receive regular updates.